600t/h – Limestone (Dolomite) Aggregate Production Flow Diagram
Note: Dotted portion in the flow diagram is the optional item that can be chosen according to the project actual situation.
600t/h – Limestone (Dolomite) Aggregate Production Equipment Configuration Table
Code
Name
Model
Unit
Quantity
Power(kw)
Total Power(kw)
Output(t/h)
Weight(kg)
Remark
G1
Grizzly Feeder
ZSW600X180
pc
1
45
45
400-1000
13500
P1
Jaw Crusher
C1412
pc
1
185
185
390-950
55820
P2
Impact Crusher
PFQ1320
pc
2
2X160
640
-350
32700
P3
Impact Crusher
PFQ1315
pc
1
250
250
-280
23570
S1
Vibrating Screen
3YKR2475
pc
2
55
110
150-900
17555
XL1
Sand Washer
XL914
pc
2
15
30
-100
6307
wet method
C1
Iron Separator
pc
1
G2
Vibrating Feeder
ZG-150
pc
2
2×0.75
3
-150
P4
Sand Making Machine
PLS-1000
pc
2
320-500
640-1000
200-585
16500
S2
Vibrating Screen
2YK2460
pc
2
37
74
120-880
9076
XL2
Sand Washer
2XL914
pc
1
2X15
30
-200
11300
wet method
C2
Iron Separator
pc
1
Code | Name | Model | Unit | Quantity | Power(kw) | Total Power(kw) | Output(t/h) | Weight(kg) | Remark |
G1 | Grizzly Feeder | ZSW600X180 | pc | 1 | 45 | 45 | 400-1000 | 13500 | |
P1 | Jaw Crusher | C1412 | pc | 1 | 185 | 185 | 390-950 | 55820 | |
P2 | Impact Crusher | PFQ1320 | pc | 2 | 2X160 | 640 | -350 | 32700 | |
P3 | Impact Crusher | PFQ1315 | pc | 1 | 250 | 250 | -280 | 23570 | |
S1 | Vibrating Screen | 3YKR2475 | pc | 2 | 55 | 110 | 150-900 | 17555 | |
XL1 | Sand Washer | XL914 | pc | 2 | 15 | 30 | -100 | 6307 | wet method |
C1 | Iron Separator | pc | 1 | ||||||
G2 | Vibrating Feeder | ZG-150 | pc | 2 | 2×0.75 | 3 | -150 | ||
P4 | Sand Making Machine | PLS-1000 | pc | 2 | 320-500 | 640-1000 | 200-585 | 16500 | |
S2 | Vibrating Screen | 2YK2460 | pc | 2 | 37 | 74 | 120-880 | 9076 | |
XL2 | Sand Washer | 2XL914 | pc | 1 | 2X15 | 30 | -200 | 11300 | wet method |
C2 | Iron Separator | pc | 1 |
Note: The Equipment configuration listed in the table is for reference. The actual configuration is determined according to the feed granularity, finished product granularity or grading, production capacity, process condition, and topographical condition etc.