In this text, we will talk about the inspection and maintenance notes of crusher.
No. | Inspection and Maintenance Parts | Maintenance Content | Inspection Standard | Maintenance Period |
1 | Lubrication parts | Each lubrication point | Pure grease and good grease feeding | Each shaft |
2 | Main body and drive parts | All bolts and the clearance between each part | Fastening well | Each shaft |
Fastening situation of Belt pulley and flywheel | Close matching | 30-45 days | ||
Wearing situation of liner plate | The wearing situation should not exceed 2/3, no cracking | 10 days | ||
Belt tensioning | The belt can press 20-40mm | every day | ||
Regulation device and spring | Elastic force keep well | 1-2 month | ||
3 | Movable jaw parts | Wearing situation of each bearing | The wearing situation meets the required standard | 3-6 month |
Wearing situation of toggle plate and its seat | Matching closely and moving flexibly | 1-3 month | ||
4 | Discharging parts | Discharging hopper | Complete without leakage | |
5 | Electrical parts | Motor temperature rise | The temperature should not exceed 60℃ | Each shaft |
Motor bearing | Suitable clearance | 1 year | ||
Electrical equipments | Clean the dust to achieve good contact | 6 month |