Installation of Double Roller Crusher

Luoyang Dahua will tell you how to install the double roller crusher

1. The foundation of crusher should be installed horizontally.

2. Adjust the roller shaft and reducer's concentricity after adjusting the machine,then fastening the stone bolts to ensure that crusher position can not be moved during operation.

3. Inspect and make sure the bearing,bearing seat and frame are well connected and can be adjusted easily. Also put lubrication oil in the slide way.

4. The spring in safety adjustment position must have enough pre-compression to make sure the crusher properly operate and each spring is stressed evenly.

5. The shield must be in good tightness and has no bumps with other parts.

Our company has rich experience in manufacturing crushing machines with low price, good performance and win great recognition and trust from the customer, if you are interested in any of them, please contact with us:

Tel: 0086-379-62669906

Email: lydhchina@huazn.comlydhjq@gmail.com